Gallery

Latest Images

22.09.2017 - Integration Progress Review
22.09.2017 - Electrical System
22.09.2017 - Mechanical System
22.09.2017 - Our Reviewers at the IPR
19.06.2017 - All parts ready for full test assembly
19.06.2017 - All parts ready for full test assembly
18.06.2017 - This is where the BlackBox will sit
18.06.2017 - Original REXUS Nosecone
16.06.2017 - Lower casing structure after drop test
16.06.2017 - Lower casing structure before drop test
09.06.2017 - All new parts
09.06.2017 - All new parts
09.06.2017 - Iridium module
09.06.2017 - Iridium module
09.06.2017 - GPS-Modules
09.06.2017 - Some antennas
09.06.2017 - D-SUB connector
09.06.2017 - FM Transmitter
09.06.2017 - CNC milled lower casing structure without cover plate
09.06.2017 - CNC milled lower casing structure with cover plate
09.06.2017 - Nice big image with the new ceiling mounted projector
09.06.2017 - Our team, busy in the conference room
27.04.2017 - Cactus Technologies
30.03.2017 - Vacuum Chamber
30.03.2017 - Vacuum Chamber
16.02.2017 - Lower casing structure 2.0
16.02.2017 - Lower casing structure 2.0
16.02.2017 - Lower casing structure 2.0
16.02.2017 - Lower casing structure 2.0
16.02.2017 - Printing of the lower casing structure 2.0 nearly finished
16.02.2017 - Start printing
16.02.2017 - Both 3D Printer
30.01.2017 - Lower casing structure
27.01.2017 - 3D Printer
27.01.2017 - 3D Printing
26.01.2017 - Internal review
26.01.2017 - Internal review
 
 
 

Javascript ist deaktiviert. Diese Seite benötigt Javascript für eine korrekte Anzeige. Bitte aktivieren Sie Javascript in Ihrem Browser!